[1]
Li, J. et al. 2025. Optimization of Multi-Stage Production Decision-Making Based on Dynamic Block-Accelerated Enumeration Algorithm. Highlights in Science, Engineering and Technology. 155, (Sep. 2025), 68–79. DOI:https://doi.org/10.54097/dxz38x84.